LATEST

CHARBONNEAU – I was wrong about the Site C dam

(Image: BCHydro)

DESPITE WHAT I SAID EARLIER, Site C is a mistake. The massive dam is being built in the Peace River region of northeastern British Columbia.

Dams are not a mistake. Hydroelectricity has made B.C. the envy of the world with cheap, renewable electricity produced with nothing but water falling through turbines.

Unlike other renewable sources of electricity, hydroelectricity is always on. In 2015, I effused:

“Unlike other sources of green energy, hydro power is ready to go when the sun doesn’t shine and the wind doesn’t blow. Water–filled dams are like a huge battery, fully charged, ready to produce power at the flick of a switch.”

Read More >>

David Charbonneau is a retired TRU electronics instructor who hosts a blog at http://www.eyeviewkamloops.wordpress.com.

About Mel Rothenburger (7841 Articles)
ArmchairMayor.ca is a forum about Kamloops and the world. It has more than one million views. Mel Rothenburger is the former Editor of The Daily News in Kamloops, B.C. (retiring in 2012), and past mayor of Kamloops (1999-2005). At ArmchairMayor.ca he is the publisher, editor, news editor, city editor, reporter, webmaster, and just about anything else you can think of. He is grateful for the contributions of several local columnists. This blog doesn't require a subscription but gratefully accepts donations to help defray costs.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

%d bloggers like this: