Advertisements
LATEST

VICTORIA STREET WEST – Stage 2 of project gets underway May 12

(Image: City of Kamloops)

Stage 2 of the Victoria Street West improvement project will get underway Sunday, May 12.

Extreme Excavating will begin Stage 2 as Stage 1 work continues and will overlap with Stage 2 work until about the end of July 2019.

“Stage 2 will encompass the Victoria Street West corridor from Seymour Street West near the BCLC upper parking lot entrance to just west of Boomers Automotive near the Overlanders Bridge,” said Darren Crundwell, the City’s capital projects manager.

“Construction will be restricted to the south side of the road, with traffic travelling on the north side of the road in two lanes—one in each direction.”

Starting the evening of May 12, crews will be removing asphalt from the south side of the road throughout the Stage 2 construction zone.

To help with traffic flow and efficiency through the construction zone, the traffic light at the south end of the Overlanders Bridge on Victoria Street West will be deactivated, said the City.

This will allow motorists travelling down Summit Drive or coming from Mission Flats heading to the North Shore to move freely onto the bridge. Motorists travelling west on Victoria Street West and heading to the North Shore will also be able to move freely onto the bridge.

Stage 1 construction is taking place between 1st Avenue and the centre island at Seymour Street West/Victoria Street West. Current Stage 1 traffic flow patterns will remain in place, and transit and emergency services vehicles will continue to receive priority routing around the Stage 1 construction zone.

In the Stage 1 construction zone, crews are continuing sanitary and water main work, Silva Cell installations (modular building blocks that allow trees and soil to manage stormwater on site), and duct bank installations for services and hydro.

All businesses along the Victoria Street West corridor are open and accessible, including those located within Stage 1 below BCLC and those located on both sides of the road within Stage 2.

“Please be courteous and allow motorists exiting from businesses, parkades, and on-street parking stalls to merge into traffic. Motorists are reminded of the posted 30 km/h speed limit throughout the construction zone and are asked to use caution and courtesy when driving in the area and utilize proper zipper merging etiquette. Please obey all traffic control devices and personnel.”

To view project staging plans, Stage 1 business access map, traffic webcams and construction photos, visit LetsTalk.Kamloops.ca/VictoriaWest.

Advertisements
About Mel Rothenburger (6747 Articles)
ArmchairMayor.ca is a forum about Kamloops and the world. It has more than one million views. Mel Rothenburger is the former Editor of The Daily News in Kamloops, B.C. (retiring in 2012), and past mayor of Kamloops (1999-2005). At ArmchairMayor.ca he is the publisher, editor, news editor, city editor, reporter, webmaster, and just about anything else you can think of. He is grateful for the contributions of several local columnists. This blog doesn't require a subscription but gratefully accepts donations to help defray costs.

1 Comment on VICTORIA STREET WEST – Stage 2 of project gets underway May 12

  1. Carol Kennell // May 10, 2019 at 8:11 AM // Reply

    Wow that is an amazing photo, brings the depth of the job into perspective.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Google photo

You are commenting using your Google account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s

%d bloggers like this: